Rio Vista Management, LLC is an SBA Certified 8(a) Contractor. It is also a Minority & Women Owned Small Business specializing in Federal & Military Construction. Based in Northern Utah with offices and other capabilities in strategic areas. Click Here To View Our Recent Projects

| Contract Description | Location | Description of Work | Recent Photos |
|---|---|---|---|
| RECOVERY - WATERLINE SUPPLY STORAGE AND DISTRIBUTION SYSTEM UPGRADE | Tobyhanna Army Depot Pennsylvania |
Work includes providing and installing approximately 5,000 L.F. of 12" ductile iron water main, associated pipe and fittings, clearing, grubbing, site restoration, and valve vault/building structure. Valve vault/building includes all interior piping, HVAC, electrical and mechanical related items and incidental related work.
|
![]() ![]() ![]() ![]() |
|
DESIGN AND CONSTRUCT FIVE (5) SLAB-ON-GRADE CONCRETE FLOORS, BUILDINGS 67, 75, 76, 77 & 78 |
Tobyhanna Army Depot Pennsylvania |
Work includes the design and construction necessary to provide five (5) slab-on-grade concrete floors (one each in Buildings 67, 75, 76, 77, and 78) in order to facilitate the Army’s equipment storage rack systems. |
![]() ![]() |
| TOOELE ARMY DEPOT BASIC ORDERING AGREEMENT (BOA) | Tooele Army Depot Utah | Indefinite Delivery Indefinite Quantity (IDIQ) contract to furnish and delivery a variety of real property maintenance, repair, alteration and minor construction work at Tooele Army Depot, Utah. |
![]() |
| Tooele Army Depot Utah | Task Order #0001, Project # A3L000-9065-1524, Replace Fire Suppression Systems in UID Warehouses, which includes replacing the existing dry pipe fire suppression systems, in six (6) 90,000 square foot warehouses, with new dry pipe fire suppression systems at Tooele Army Depot, Utah. |
![]() |
|
| Tooele Army Depot Utah | Task Order #0002, Project # A3L000-9115-1531, Construct Acid Hydrolysis Building, which includes the design and construction of 70' x 40' pre-engineered metal building. The task order will include site development, footings & foundation, structure, electrical, fire suppression and alarm systems in the 1400 area complex at Tooele Army Depot, Utah. |
![]() ![]() ![]() |
|
| Tooele Army Depot Utah | Task Order #0003, Project # A3L000-0051-1601, Replace PIV Building 699, Work includes the excavation and replacement of an existing 8” Post Indicator Valve with new at the south end of building 699 at Tooele Army Depot, Utah. | ||
| Tooele Army Depot Utah | Task Order #0004, Replace Concrete Slab Building 1219, Work includes the removal and replacement of an existing interior concrete floor slab in Building 1219 at Tooele Army Depot, Utah. |
![]() |
|
| REPAIR FIRE SUPPRESSION SYSTEM BUILDING 225 | Hill Air Force Base Utah | Convert 6 existing pre-action sprinkler systems to wet pipe systems. |
![]() ![]() |
| DEMOLITION OF BUILDING 820 | Hill Air Force Base Utah | Complete Demolition of Building 820 including concrete footings and foundation, utilities, and the removal of all materials and debris from the site. |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
| DEMOLITION OF BUILDING 1915 | Hill Air Force Base Utah | Complete Demolition of Building 1915 including concrete footings and foundation, utilities, and the removal of all materials and debris from the site. |
![]() |
| DEMOLITION OF BUILDING 1917 | Hill Air Force Base Utah | Complete Demolition of Building 1917 including concrete footings and foundation, utilities, and the removal of all materials and debris from the site. |
![]() |
| RENOVATE BRIGADE HEADQUARTERS BUILDING 29014 | Fort Hood Texas | Renovate Building 29014 including doors, frames, hardware, floor tile, wall, ceilings, flooring, restrooms, restroom specialties, HVAC, plumbing, plumbing components, electrical, electrical devices, communications, communication devices and light fixtures. |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
| TBI-1 OCCUPATIONAL HEALTH FACILITY BUILDING 36046 |
Fort Hood Texas | Construct of a new 5,000 sq ft Occupational Health Facility, including offices, kitchen, latrines, and open bay space. |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
| TBI-2 TRAUMATIC BRAIN INJURY FACILITY BUILDING 42006 |
Fort Hood Texas | Construction of a new 5,000 sq ft Traumatic Brain Injury Facility, including offices, kitchen, latrines, and open bay space. |
![]() ![]() ![]() ![]() |
| RENOVATE BRIGADE HEADQUARTERS BUILDING 39009 | Fort Hood Texas | Renovate Building 39009 including doors, frames, hardware, floor tile, wall, ceilings, flooring, restrooms, restroom specialties, HVAC, plumbing, plumbing components, electrical, electrical devices, communications, communication devices and light fixtures. |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
| RENOVATE 4 COMPANY OPERATIONS FACILITIES IN THE 87000 BLOCK | Fort Hood Texas | Renovation of four company operations facilities including substantial demolition, asbestos abatement and reconstruction. |
![]() ![]() ![]() ![]() ![]() |
| Fort Hood Texas | Building 87004 - Renovate building 87004 (company operations facility) Building 87004 will be reconstructed with office areas, latrines, mechanical systems, electrical systems, exterior finishes and storage areas. Work includes framing, drywall, electrical devices, lighting, communications, HVAC, plumbing, controls, doors, frames, hardware, ceramic tile, ceilings, flooring and restroom specialties. |
![]() ![]() ![]() ![]() ![]() |
|
| Fort Hood Texas | Building 87014 - Renovate building 87014 (company operations facility) Building 87014 will be reconstructed with office areas, latrines, mechanical systems, electrical systems, exterior finishes and storage areas. Work includes framing, drywall, electrical devices, lighting, communications, HVAC, plumbing, controls, doors, frames, hardware, ceramic tile, ceilings, flooring and restroom specialties. |
![]() ![]() ![]() ![]() |
|
| Fort Hood Texas | Building 87016 - Renovate building 87016 (company operations facility) Building 87016 will be reconstructed with office areas, latrines, mechanical systems, electrical systems, exterior finishes and storage areas. Work includes framing, drywall, electrical devices, lighting, communications, HVAC, plumbing, controls, doors, frames, hardware, ceramic tile, ceilings, flooring and restroom specialties. |
![]() ![]() ![]() |
|
| Fort Hood Texas | Building 87019 - Renovate building 87019 (company operations facility) Building 87019 will be reconstructed with office areas, latrines, mechanical systems, electrical systems, exterior finishes and storage areas. Work includes framing, drywall, electrical devices, lighting, communications, HVAC, plumbing, controls, doors, frames, hardware, ceramic tile, ceilings, flooring and restroom specialties. |
![]() ![]() |
|
| CONSTRUCT NEW TOBYHANNA SERVICE FACILITY BUILDING 4435 | Fort Hood Texas | Construction of a new 4,300 sq ft Electronic Repair & Service Facility, including service technician workstations. |
![]() |
|
REPAIR UNDERGROUND WATERLINE, BUILDING 7021 |
Fort Hood Texas | Repair Underground Waterline, Building 7021, Project # AF109107P, Work includes excavation between the PIV and building in order to determine the location of the leak and to inspect the overall condition of the line; then repair and reset the fire protection system. | |
|
RESTORE BUILDING 39016 |
Fort Hood Texas | Restore Building 39016, Project # AD002888P, Work includes framing, drywall, painting interior walls, replace carpet, cove base, ceramic tile, water closets, water fountains, bathroom cabinets, fire extinguisher, doors, demolish HVAC and concrete, sidewalks and trimming trees and shrubs in the area. | |
|
REPAIRS TO BUILDING 39016 |
Fort Hood Texas | Repairs To Building 39009, Project # 13090250P, Work includes replacement of exterior windows, repairs to the fire alarm system, installation of emergency battery backups to existing light fixtures, and sealing walls for fire rating and security.
|
|
| RENOVATION OF BATTALION HEADQUARTERS HVAC, BUILDING 31012 | Fort Hood Texas | Renovation Of Battalion Headquarters HVAC, Building 31012, Project # 4I090299P, Work includes the removal and replacement of the failing HVAC equipment and temperature control systems. |